Natural Gas Gathering
- Construction of 10 miles of various size piping ranging from 2” to 10” with two (2) Horizontal Directional Drills (HDD) crossings. Installation of compressor site.
- Fabrication and installation of 3 compressor stations.
- Construction of 5 miles of 12” pipleline connecting to various wells and a compressor station.
- Engineering and Permitting for 23 miles of 12” pipeline.
Natural Gas Transportation
- Installation of 8 miles of 24” diameter pipeline in NJ.
- Installation of 3,000 feet HDD of 20” diameter pipeline under the Susquehanna River in NY State.
- Installation of 9 miles of a 20” diameter pipeline in NY State.
- Installation of 8 miles of a 12” diameter pipeline in NY State.
- Installation of 6 miles of 6” diameter pipeline in NY State.
- Installation of 7 miles of 16” diameter pipeline, fabrication and installation of 21 well sites, installation of 6”, 4”, and 2” well laterals for storage well.
- Anomaly repair work
- Various take up and relay projects.
Liquid Petroleum Transportation
- Installation of 5,200 feet of 12” HDD under the Delaware River in PA.
- Installation of 18,000 feet of 10” in Western PA.
- Pipeline anomaly digs.
- Various relocation projects.
- Ultra Low Sulfur Diesel upgrade projects.
- Emergency Responder Contractor
| |